| 12 |
Dongwoo ALT Biomass Boiler Flue Gas Treatment Facility Installation Project Dust Collection Facility |
AIR HEADER, etc. |
2015.12~2016.04 |
| 11 |
Pohang 2FINEX TRUCK HOPPER PROJECT |
BLOW TUBE, etc. |
2015.11~2015.12 |
| 10 |
Philippines PAGBILAO ENERGY PROJECT |
SLIDE GATE, etc. |
2015.11~2015.12 |
| 9 |
Pohang Technology Research Institute's main building dust collector |
Rotary Valve, etc. |
2015.11~2016.02 |
| 8 |
Namyang Dairy Sejong Plant Energy Utilization Rationalization Project |
AIR HEADER, etc. |
2015.11~2016.02 |
| 7 |
Samcheonpo Thermal Power Plant Units 1 and 2 |
AIR HEADER, etc. |
2015.10~2015.12 |
| 6 |
Maintenance project for Dangjin Thermal Power Plant Units 5 and 8 |
AIR HEADER, etc. |
2015.10~2015.12 |
| 5 |
Gwangyang No. 5 Blast Furnace PCI Dust Collector |
SLIDE GATE, etc. |
2015.10~2015.11 |
| 4 |
Pohang 4th Performance SLAB GRINDER Dust Collector |
SCREW CONVEYOR, etc. |
2015.09~2015.12 |
| 3 |
Improvement of the SCALE scattering prevention equipment at the entrance of Gwangyang No. 2 cold-rolled PCM plant |
Rotary Valve, etc. |
2015.09~2015.10 |