| 322 |
Pohang No. 4 Blast Furnace PCI_EMERGENCY BAG FILTER |
AIR HEADER, etc. |
2023.06~2024.01 |
| 321 |
Pohang No. 4 Blast Furnace PCI_MAIN BAG FILTER |
AIR HEADER, etc. |
2023.06~2024.03 |
| 320 |
Installation of a new dust collector at the RH sedimentation pipe dismantling yard at the Pohang Refractory Integrated Repair Center. |
AIR HEADER, etc. |
2023.06~2023.09 |
| 319 |
Pohang Linear SHED Dust Collection Facility Installation, Yangso Raw Material Yard Sealing Stage 1 |
AIR HEADER, etc. |
2023.06~2024.09 |
| 318 |
Hi-Tech BAG FILTER |
AIR HEADER, etc. |
2023.06~2023.07 |
| 317 |
Pohang No. 4 Blast Furnace 3rd Refurbishment_NO. 1 Dust Collector |
AIR HEADER, etc. |
2023.05~2023.12 |
| 316 |
Pohang No. 4 Blast Furnace 3rd Refurbishment_NO. 2 Dust Collector |
AIR HEADER, etc. |
2023.05~2023.12 |
| 315 |
Pohang No. 4 Blast Furnace 3rd Refurbishment_NO. 3 Dust Collector |
AIR HEADER, etc. |
2023.05~2023.12 |
| 314 |
Ulsan Incinerator |
AIR HEADER, etc. |
2023.04~2023.07 |
| 313 |
Gwangyang No. 2 Steelmaking Pretreatment Dephosphorization Furnace Evaporation Cooler Dust Discharge Facility |
FLOW CHAIN CONVEYOR, etc. |
2023.04~2023.07 |